Shell China Group headquarters moved and established "Shell Rural Education Development Fund"

On May 24, 2017, the headquarters of Shell China Group officially moved into a new office in Block B of Beijing Guomao Building.

On the same day, the employees of Shell China and the special guests participated in the simple and grand launch ceremony of the new office. Among the new office ribbon cuts are Zhao Jungui, Vice President of the China Petroleum and Chemical Industry Federation, Zhang Zhiguo, Executive Secretary of the Party Committee of the Beijing Municipal CBD Management Committee, Member of the Executive Committee of the Royal Dutch Shell Group, Director of Natural Gas Integration and New Energy Business, Wei Si Le, and Shell. China Group Chairman Zhang Xinsheng.

Beijing International Trade Building Beijing International Trade Building

Shell has more than 120 years of history in China. Prior to the reform and opening up, Shell's main office was located at the Asian Building on the 1st Bund in Shanghai. At the beginning of the reform and opening up, Shell returned to mainland China in 1980 and set up its first office in Beijing in Yeongwon Garden in Beijing's Summer Palace. In 1982, it moved to the third floor of the Peace Gate Roast Duck Restaurant and established the first Western-style office in Beijing. Department; moved to China World Tower in 1990.

Zhang Xinsheng delivered a speech at the launching ceremony and said: “The change in the headquarters of Shell China Group marks the rapid development of China and the expansion of office space. Before today, more than 700 employees of Shell in Beijing were scattered in the three buildings of the CBD. I'm very happy to work in the office building. Starting today, all of Shell's employees in Beijing can work in a building. This is not only a joy to move but also a new milestone for Shell's development in China.”

At the end of the ceremony, Chairman Zhang Xinsheng and Vice President of the Chinese Foundation for Poverty Alleviation Wang Xing announced that they jointly initiated the establishment of the "Shell Rural Education Development Fund." Chairman Zhang, on behalf of the Shell China Group, donated 1 million yuan to the fund for use by rural teachers. Vocational training and professional capabilities.

At present, all core business of Shell Group has made great progress in China and has invested billions of dollars. Shell has been cooperating with CNPC to produce natural gas in Changbei Gas Field since 2007, providing China with the necessary energy for rapid economic development. Shell's downstream operations in China include 11 joint ventures and 8 sole proprietorships. Shell is a leading international lubricants supplier with four lubricant blending plants and one grease production plant in China, as well as a technology center dedicated to oil product development. Shell also operates more than 1,200 gas stations in China through joint ventures and wholly-owned companies. In November 2016, Shell Qingdao Branch of Huabei Petroleum Group was established and its first gas station in Qingdao was opened at the same time. Shell also established a wholly-owned company in Zhejiang Province, Zhejiang Shell Fuel Co., Ltd., to establish a retail network in Zhejiang Province. The first gas station was officially opened in Yuyao City in February 2017. Shell owns one asphalt production plant and one joint venture production plant in China. Shell also has a joint venture with CNOOC and operates a world-class Nanhai Petrochemical Complex Plant in Daya Bay District, Huizhou City, Guangdong Province. The second phase of the capital increase of this project has been approved by the government and will increase the annual ethylene cracking capacity by 1.2 million tons. It is expected that the fourth quarter of 2017 will be completed. Put into production. Shell's clean coal technology is applied to 23 Chinese corporate projects in the form of technology transfer. Shell Energy (China) Co., Ltd. is a new member of Shell's downstream business in China, engages in trading business and actively participates in China's emerging carbon dioxide trading.

Continuous Waste Plastic Pyrolysis Plant

Pyrolysis Plant is used for recycling waste tire, waste plastic, waste rubber to fuel oil. According to the actual situation in every country and district, we developed different models of Batch Pyrolysis Plants for waste tires, rubber and plastic with daily capacity 25-40 tons.

Continuous Waste Plastic Pyrolysis Plant

Flow-chat of Continuous Waste Plastic Pyrolysis Plant

Continuous Waste Plastic Pyrolysis Plant

Advantages of Continuous Waste Plastic Pyrolysis Plant

 1.  Large daily capacity of 25 MT raw materials, and can work 24 hours without any stop for 15-20 days;

                  2.  Auto-loading, auto-discharging and oil coming out at the same time;

                  3.  Only need fuel for the beginning 2-3 hours, then the sync gas generates itself is enough to support heating, saving fuel cost;

                  4.  Low requirement on the raw materials, no need tiny granule, 5cm pieces acceptable for smooth running;

                 5.  High efficiency condensers, more oil output, good quality oil, easy to clean.

                 6.  Sync gas recycling system, fully burned after recycling and utilization, preventing pollution and saving fuel cost.

                7.  National patent smoke scrubber, can efficient remove the acid gas and dust of the smoke, environmental friendly to meet related national standards.

               8.  Easy to operate, need less manpower.

 

Technical Parameter of Continuous Waste Plastic Pyrolysis Plant

          

NO.

ITEM

Technical Parameter

1

Suitable Raw Materials

Small pieces of Waste tyre,rubber, waste plastic≤5cm

2

Operating Mode

Fully Continuous Operation

3

Structure

Horizontal Type Revolve

4

Loading and discharging

Fully Automatic Feeding and Discharging under High Temperature at Same Time

5

Capacity(24h)

8-20Mt

6

Work Pressure

Slightly Negative Pressure

7

Oil Yield of tyres

40%-45%

8

Reactor Rotational Speed

1R/M

9

Installation Power

110kw

10

Cooling Method

Cycle water

11

Type of Drive

Sprocket Wheel

12

Heating Method

  Hot Air

13

Noise dB(A)

≤85

14

Main Reactor Weight (MT)

About 20Mt

15

Total Weight(MT)

About 45Mt

16

Installation Space Required

60m*20m

17

Manpower

2/shift

18

Shipment

5*40HC

19

Delivery time

≤70Days

 

 

 

 

 

 

Continuous Waste Plastic Pyrolysis Plant

Continuous Waste Plastic Pyrolysis Plant,Continuous Plastic Pyrolysis Plant,Plastic Pyrolysis Plant

Shangqiu Jinpeng Industrial Co., Ltd. , https://www.recyclings.nl