(1) PIPEÂ FITTINGS SERIES
ASME B 16.9/MSS SP 75 Elbow,Tee,Reducer,Cap,stub end,
Material:CS:A234WPB/WPC,A420WPL3/WPL6/WPL9,A860WPHY52/60/65/70
       AS:A234WP1/5/9/11/22/91
       SS:A403WP304/304L/316/316L/317/321
       Aluminum:1070A,1060,1100,1200 ,2A11,2017,2A12,2024 ,3003   3A21,5A02,5052,5A03,5A05,5A06,5083,5086,5454,6061,6063,6A02,6082,6005Â
 Â
(2)FLANGES SERIES:
DIN 2573 PN6 DIN 2576 PN10 DIN2502 PN16 DIN2503 P25-40 DIN2566 PN16 ,DIN2631-2635 RST37.2 OR C22.8 carbon steel flangeÂ
ANSI B16.5, 150LB 300LB 600LB 900LB 1500LB 2500LB WNRN SORF BLRF THRF SWRF LJRFÂ
JISÂ SS400Â ORÂ SF440Â 5KÂ 10KÂ 16KÂ 20KÂ 30KÂ SOPFFÂ SOHFFÂ BLFFÂ
EN1092Â PN6Â PN10Â PN16Â PN25Â PN40Â TYPE1Â TYPE2Â TYPEÂ 5Â TYPEÂ 12Â TYPEÂ 13Â
BS4504Â SANI1123Â 1000/3Â 1600/3Â 2500/3Â T/DÂ T/EÂ T/FÂ
Descritption
Product |
aluminum pipe flanges |
Thickness |
15mm-300mm |
Outer diameter |
100mm-2000mm |
Alloy grade |
1000 series : 1070A,1060,1100,1200 |
 |
2000 series :2A11,2017,2A12,2024 |
 |
3000 series :3003 3A21 |
 |
5000series :5A02,5052,5A03,5A05,5A06,5083,5086,5454 |
 |
6000 series :6061,6063,6A02,6082,6005 |
Temper |
H112 . F , O, T |
Surface |
Mill Finish, Anodized, Powder Coated, Wooden Finish, Polish |
Packing |
Export standard |
Payment Terms |
100% irrevocable L/C at sight or 30% T/T in advance as deposit,70% balance before shipment |
MOQ |
 1 Piece |
Delivery time |
 20-45 days after receiving L/C or deposit |
Loading Port |
 Xingang Port,Tianjin |
FAQ
Q:What's your raw material? Â Â Â Â Â
A: We use 100% new raw material.
Q: What is your MOQ? Â Â Â Â Â Â Â Â Â Â
A:As customer's request ( For example: FLANGE DN20, MOQ 500KGS).
Q:How is the production ability?or delivery time? Â Â Â Â Â Â Â
A:40 HQ order finishing in one month.
Q: What is the regular shipping port? Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
A: Shanghai Port.
Q:What is your terms of payment ? Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment. China Forging Slip on Aluminum Flange Supplier for Exhaust Pipe Fittings
(1) PIPEÂ FITTINGS SERIES
ASME B 16.9/MSS SP 75 Elbow,Tee,Reducer,Cap,stub end,
Material:CS:A234WPB/WPC,A420WPL3/WPL6/WPL9,A860WPHY52/60/65/70
       AS:A234WP1/5/9/11/22/91
       SS:A403WP304/304L/316/316L/317/321
       Aluminum:1070A,1060,1100,1200 ,2A11,2017,2A12,2024 ,3003   3A21,5A02,5052,5A03,5A05,5A06,5083,5086,5454,6061,6063,6A02,6082,6005Â
 Â
(2)FLANGES SERIES:
DIN 2573 PN6 DIN 2576 PN10 DIN2502 PN16 DIN2503 P25-40 DIN2566 PN16 ,DIN2631-2635 RST37.2 OR C22.8 carbon steel flangeÂ
ANSI B16.5, 150LB 300LB 600LB 900LB 1500LB 2500LB WNRN SORF BLRF THRF SWRF LJRFÂ
JISÂ SS400Â ORÂ SF440Â 5KÂ 10KÂ 16KÂ 20KÂ 30KÂ SOPFFÂ SOHFFÂ BLFFÂ
EN1092Â PN6Â PN10Â PN16Â PN25Â PN40Â TYPE1Â TYPE2Â TYPEÂ 5Â TYPEÂ 12Â TYPEÂ 13Â
BS4504Â SANI1123Â 1000/3Â 1600/3Â 2500/3Â T/DÂ T/EÂ T/FÂ
Descritption
Product |
aluminum pipe flanges |
Thickness |
15mm-300mm |
Outer diameter |
100mm-2000mm |
Alloy grade |
1000 series : 1070A,1060,1100,1200 |
 |
2000 series :2A11,2017,2A12,2024 |
 |
3000 series :3003 3A21 |
 |
5000series :5A02,5052,5A03,5A05,5A06,5083,5086,5454 |
 |
6000 series :6061,6063,6A02,6082,6005 |
Temper |
H112 . F , O, T |
Surface |
Mill Finish, Anodized, Powder Coated, Wooden Finish, Polish |
Packing |
Export standard |
Payment Terms |
100% irrevocable L/C at sight or 30% T/T in advance as deposit,70% balance before shipment |
MOQ |
 1 Piece |
Delivery time |
 20-45 days after receiving L/C or deposit |
Loading Port |
 Xingang Port,Tianjin |
FAQ
Q:What's your raw material? Â Â Â Â Â
A: We use 100% new raw material.
Q: What is your MOQ? Â Â Â Â Â Â Â Â Â Â
A:As customer's request ( For example: FLANGE DN20, MOQ 500KGS).
Q:How is the production ability?or delivery time? Â Â Â Â Â Â Â
A:40 HQ order finishing in one month.
Q: What is the regular shipping port? Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
A: Shanghai Port.
Q:What is your terms of payment ? Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
The power system mainly includes two major categories of power generation equipment and power supply equipment. The power generation equipment is mainly power station boilers, steam turbines, gas turbines, water turbines, generators, transformers, etc. The electric energy can be said to be applied in almost any field, corresponding to electric power. The demand for equipment is also a requirement for stable and safe work that must be uninterrupted for a long time. Box-type substation, also known as pre-installed substation or pre-installed substation. It is a kind of high-voltage switchgear, distribution transformer and low-voltage power distribution device. It is equipped with a pre-fabricated indoor and outdoor compact power distribution equipment according to a certain wiring scheme. It is about high-voltage power receiving, transformer step-down, low-voltage power distribution and other functions. Organically combined to correspond to the high temperature used for such a long time.
Power Equipment Heat Exchanger
Power Equipment Heat Exchanger,Heat Transfer Equipment,Heat Exchanger For Oil,Oil Cooling System
Xinxiang Zhenhua Radiator Co., Ltd. , https://www.thermal-manage.com