
It is reported that the Lajai Railway is an extension line of the Qinghai-Tibet Railway and is one of the important projects of the National "Eleventh Five-Year Plan" and "Mid-and-Long-Term Railway Network Plan". The project starts from the Lhasa at the end of the Qinghai-Tibet Railway, runs through Lhasa, Henan, and passes through the Delong Deqing, Qushui, and Shunya-Luzang Tibetan Rivers. It passes through a canyon area of ​​nearly 90 kilometers in length. It reaches Nishigashi from Nimmu and Rinbo and is 253 kilometers long. The whole line has 13 stations, and the design standard grade is National Grade I railway. The whole line is single-line, and the electrification conditions are reserved. The train operating speed is not less than 120 kilometers per hour and the annual cargo volume can reach more than 8.3 million tons. The Laiyashi Railway started construction in 2011 and the construction period is 4 years. On May 14th, the largest battlefield reconstruction project in the construction of the railway in Lajai - Lhasa station, Lhasa West Station and Liuxun Line (referred to as "two stations and one station") battlefield reconstruction project started, which lasted 7 days on the 20th. Officially completed the integration with the Qinghai-Tibet Railway.
Fiberglass Insect Screen,Fiberglass Screen,Fiberglass Mosquito Net,Fiberglass Mosquito Net Roll
ANPING FUHUA WIRE MESH MAKING CO.,LTD , https://www.apfuhuawire.com