1. Set the workpiece coordinate system zero (as shown in Figure 1)
Figure 1 Setting the workpiece coordinate system zero
1) Tool setting operation Set the manual main function status of CNC milling machine The tool is located on the left side of the workpiece and slightly touches the left side of the workpiece. The X coordinate value is recorded. The tool is located on the front side of the workpiece and touches the front side of the workpiece slightly, recording the Y coordinate value. The tool is located above the workpiece, slightly touching the top surface of the workpiece and recording the Z coordinate value 2) Workpiece coordinate system origin coordinate calculation X0=-(∣X∣-d /2) Y0=-(∣Y∣-d /2) Z0=Z 2) Set the workpiece coordinate system Move the tool to the coordinates of X0, Y0, Z0. At this time, the tool location coincides with the zero point of the workpiece coordinate system. Set the zero milling subfunction state of the CNC milling machine. Set the coordinate values ​​of X0, Y0, Z0 to zero and establish the value in the CNC system. The workpiece coordinate system with the tool point as the origin.2. Tool setting method
Fig. 2 Tool setting method
As shown in Figure 2, determine the radius of the blade tip to the spindle axis of each blade and the height of the blade tip to the reference surface, and calculate the difference between the height of each blade and the height of the standard tool tip. After the tool parameters are input to the CNC system, the CNC tool automatically implements tool radius compensation and tool length compensation through the tool compensation commands.Taichong Yuye has designed and manufactured almost all the hydraulic systems of ship lifts in China. The products are all over the Yangtze River, Jinsha River, Jialing River, Wujiang River, Qingjiang River and other river basins, meeting the requirements of different types of ship lifts, such as wire rope winch, rack and pinion climbing ship lift, etc., and each project has been praised by users. The successful design and manufacture of the Hydraulic System of the 3000 ton ship lift in the Three Gorges project marks that the design and manufacture capacity of the hydraulic system in the hydraulic industry of our company is in the leading position in China.
Technical characteristics
01.The perfect combination of precise new hydraulic control technology and shiplift operation procedures ensure the high efficiency of shiplift operation
02. Meet the requirements of harsh working environment, and can safely and reliably keep the ship lift equipment locked or in normal operation even under the influence of external extreme conditions
Hydraulic System
Simple Hydraulic System,Auxiliary Hydraulic System,Hydraulic And Pneumatic Systems,Heating Machine With Hydraulic System
Shanxi Guoneng Zhenghe International Trade Co., Ltd , https://www.sxsyysb.com