10TonX1250mm Hydraulic un-coiler |
Hydraulic system to expand coil inner hole |
Load Capacity: Max. 10 Tons; Coil Width Max. 1250mm |
Coil Outer-diameter Max. 1500mm |
Retarding Motor to turn the coil, Motor: 5.5KW |
The arm to be driven by pneumatic cylinder, manual control |
Option: 1. 3/5/6/10/ 15 TON HYDRAULIC UN-COILER Pl refer to the attached pictures for details |
5. Service after sell |
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. |
Â
10TonX1250mm Hydraulic un-coiler |
Hydraulic system to expand coil inner hole |
Load Capacity: Max. 10 Tons; Coil Width Max. 1250mm |
Coil Outer-diameter Max. 1500mm |
Retarding Motor to turn the coil, Motor: 5.5KW |
The arm to be driven by pneumatic cylinder, manual control |
Option: 1. 3/5/6/10/ 15 TON HYDRAULIC UN-COILER Pl refer to the attached pictures for details |
5. Service after sell |
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. |
Â
Critical Boiler,Supercritical Boiler,Power Plant Boiler,Boiler In Thermal Power Plant
Jinan Boiler Group Co., Ltd. , https://www.jinanboilergroup.com